Physical infrastructure
Clean execution with Cat6A and fiber, organised racks, Fluke reports, and as-built documentation for audits and future expansion.
+1,200
Average delivered every semester.
48h
Documentation delivered up to 48 hours after completion.
5 years
Approved materials with extended warranty.
When we're called in
These scenarios help us demonstrate the SLA, governance, and user experience gains we deliver.
No standards make troubleshooting harder and increase downtime risk.
Legacy cabling and improvised routes limit high-density projects.
Lack of documentation compromises audits, compliance, and warranties.
Turning strategy into outcomes
Governance, metrics, and processes designed so your operation doesn't fall back.
Backbone supports Wi-Fi 6/6E, cloud telephony, and IoT with headroom.
Fluke reports, photo book, drawings, and addressing spreadsheet.
Project phased by area with specific windows for each operational block.
Execution
Documentation, spares, integrations, and governance delivered with the project.
Detailed executive project
Specifications, drawings, approved materials, and schedule.
Cable routing and organisation
Clean paths, standard labelling, reviewed and identified racks.
Certification and reports
Fluke DSX tests, attenuation measurements, and signed documentation.
As-built and ART
Updated drawings, photo book, and technical responsibility annotation.
In-house supervised crew
Certified technicians with daily oversight from the lead engineer.
Compliance with NR-10 and NR-35
Safety guaranteed in critical environments and work at height.
Integrated with ASSIST network services
Cabling prepared for firewall, Wi-Fi, and monitoring deployments.
Stages
Every phase is documented, audited, and connected to ASSIST monitoring.
On-site assessment, route definition, materials, and approved schedule.
Cable routing, rack assembly, identification, and certification.
Reports delivered within 48h, basic training, and handover to the NOC.
Methodical execution from day one We plan every phase with checklists: preparation, cable routing, certification, and delivery. Everything is logged with photos to guarantee transparency.
Infrastructure ready for what comes next The project leaves spare capacity, conduits, and capacity spreadsheets so future expansion happens without improvisation.
Quick case
Three blocks: starting point, what we executed, and the impact recorded.
Legacy cabling without identification and outages in computer labs.
FAQ
Yes. We work with phased schedules and coordinate with electrical, HVAC, and fire-safety contractors.
We structure billing per phase, aligned with the project’s financial schedule.
Yes. We use approved brands and issue ART signed by the responsible engineer.
Deliver cabling with certified reports, structured racks, and integration to monitoring and managed support.